Castlewood Plot 10
In September 2022 we were instructed to install deep drainage, catchpits and an outfall into an existing ditch onsite to enable the land drainage to be installed on what was an exceptionally challenging wet site.
In February of 2023 we were invited to return and make the foul and surface water connections onto the Severn Trent water sewers in the existing highway. Works included installation of a new site entrance, with the priority of maintaining 24 hour access into the busy site at all times. On completion of these works we were further instructed to carry out the installation of flow control chambers, ACO kerbs and 3000m² stoning up ready for tarmac.
further instructed to carry out drainage alterations and the installation of flow control chambers Linear drainage channels and type 1 sub base to carpark and roadways.
Total duration: 14 weeks